Our AdvantagesProducts Big quantity in Stock, No MOQ necessary We comply with all the international specifications, such as ISO9001 and TS16949 specifications. EPG has been efficiently qualified by ISO9002 High quality Management Program, ISO9001 Good quality Management Technique, API certificate, ISO/TS16949:2002 and ISO10012 measurement administration system. In this way, our items have ongoing to acquire market acceptance and customers satisfaction over the past couple of many years. Merchandise introduction
Stainless Metal JIC EPT JCEP ninety Elbow Swivel Feminine Adapter
EPTnical Help
QC EPTs engineering has the capacity to layout drawings conform to SAE, BS, JIS, DIN amp ISO specifications. And we can also make according to customers’ drawings or samples.
Associated EPT
EPT Examination Certification(EN15714/three.one)
We can give the MTR for each and every cargo.
Generation Process
Deal and EPT
Our Certificate
QC EPTs has been granted ISO 9001:2015 amp SGS certificates for processing stainless steel EPT hose fittings and adapters.
Why Decide on Us?
1. Background:
QC EPTs is an ISO 9001:2015 accredited maker with more than twenty year’s manufacturing experience, EPTTizing in EPT hose fittings and adapters. We only concentrate stainless metal materials, no carbon steel or brass.
two. Solution selection, trustworthy top quality:
1. EPT EPT JCEPs
one). 43 Series CrEPTT EPT JCEPs/Couplings
2). HY Sequence CrEPTT EPT JCEPs/Couplings
3). BW Collection CrEPTT EPT JCEPs/Couplings
4). Stainless Steel EPT Ferrule For SAE 100R 1AT, 2AT EPT
five). Stainless Metal Woman JIC 74 Degree Flare EPT JCEP
6). Stainless Steel Woman BSP sixty Diploma Cone EPT JCEP
seven). Stainless Steel BSP EPT sixty Diploma Cone Seat EPT JCEP
eight). Stainless Metal Female BSP 60 Diploma Cone 90 Elbow EPT JCEP
9). Stainless Metal NPT EPT EPT JCEP
2. EPT Adaptors
1). NPT EPT Thread Adapters
2). O-ring Manager SAE/ORB Adapters
3). JIC 37 Degree Flare Adapters
4). NPEPT EPT Thread (female swivel) Adapters
five). O-ring Face Seal (ORFS) Adapters
six). BSPP/BSPT Adapters
3. Stainless DIN Metric EPT JCEPs
four. Stainless reusable hose fittings
five. Lower force stainless metal thrust on hose finishes and hose barbs
three. EPTT EPTT Of Raw EPT:
1. We only decide on the optimum high quality stainless metal raw material. And steel suppliers give content check certificates for each and every cargo.
2. We a hundred% evaluate the dimensions of bar inventory and forging blanks by callipers for every single cargo.
3. We use the Portable XRF Analyser to test the crucial chemical aspects of bar stock and forging blanks with 10% for each shipment(Essential chemical aspects incEPTT Cr, Ni, Mo, these chemical factors are extremely EPTTant for the corrosion functionality)
four. In addition to, we randomly decide up numerous of chopping parts to do further chemical analysis by spectrograph each and every ten daEPTTto make confident the raw material one hundred% certified.
four. EPTT EPTT Of Generation Method:
one. We are utilizing Sigma EPT-EPT CNC Lathe EPTTs to manufacture stainless metal hose fittings and adapters.
The features of CNC Lathe EPTTs:
one). Dual-aXiHu (West EPT) Dis.s, EPT program
2). Thread slicing instruments: EPT Japan, vargus amp carmex Israel(Have a quite stable functionality in the course of machining)
two. We use callipers to measure the simple dimensions. And we use the thread gages to inspect the threads.
three. We use Contracer amp Contour Measuring EPTTs to inspect the extremely modest angles and diameters.
5. Inspection:
1. Initial Report Inspection Throughout Procedure
one).The operator make the initial write-up in accordance to manufacturing drawings.
2). The operator will examine the first report and record. If the dimensions and threads meet up with the production drawings, and then the very first article will be set in a EPTT box( the box is for initial report only).
three). Workshop foreman will take next inspection for the 1st article.
4). Only passing the inspection by workshop foreman, and then commence with mass generation.
two. Mass Generation After Initial Write-up Inspection
1).Soon after the initial report authorized by operator and workshop foreman, and then start with mass manufacturing.
2). Throughout mass generation, the operator requirements to examine the threads each ten items, and evaluate the measurements each 15 items. When any fittings of threads and dimensions out of the specs, all this batch of fittings will be inspected entirely.
three). The experienced fittings will be fitly put in a plastic box piece by piece.
4). Last but not least, the finished fittings will be transported to inspection section for final inspection.
three. Ultimate Inspection
1). Physical appearance: 100% inspection unEPTTstrong light. No scratch, No burr.
2). Crucial dimensions and angles: fifteen-20% randomly inspection by callipers and contracer. When any measurements and angles of fittings out of specs or does not respect to drawings, this batch of fittings will be compelled to return back to generation workshop to increase or make a new alternative.
3).Threads: fifteen-twenty% randomly inspection by rigEPTT gages. Once any threads out of specs or does not respect to drawings, this batch of fittings will be pressured to return back again to manufacturing workshop to increase or make a new replacement.
six. Following Provider:
When consumers have any problems about our goods, we will get a fast motion.
We can 100% make a new substitution for cost-free when the shopper has a complaint about our merchandise.
Our EPTT
FAQ
Q: Are you a buying and selling company or manufacturer?
A: We are a one hundred% maker, primary goods cover stainless metal EPT hose fittings and stainless metal EPT adapters.
Q: Do you have stock?
A: At the moment we created to purchase, but we do have some stocks for common sort uncooked materials. So we can make a swift action for some urgent orders.
Q: Do you have a MOQ ask for?
A: Normally our MOQ is two hundred pieces. But for some greater measurements, fifty or a hundred items is also appropriate for the initial get.
Q: How about your payment technique?
A: thirty% deposit in EPT, the balance payment against the duplicate of Monthly bill of lading. Of program, I feel every thing is negotiable.
Q: What about your delivery time?
A: About 45 daEPTTfor common orders. But it is dependent on the orEPTTvolume. Of course, if you have an urgent get, we will attempt ideal to meet up with you.